Phase 3 Offices and Warehouse development for St Modwen Logistics. Installation of AC heat pumps, heat recovery ventilation, domestic services gas and external water.
Following building works to demolish part of the SKDC offices a new plantroom was created to serve the Civic Centre.
New Ideal boilers installed with low loss header, 4 pumped heating circuits and Mikrofill pressurization set.
Other works included a new control panel, heating to new office areas and installation of new toilet areas.
Maintenance carried out to fan coil units, control systems. AHU plant and pumps throughout the office building.
Installation of new boiler plant, welded pipework serices , pressurisation unit and controls.
Installation of roof top boiler plant, gas pipework , pumps, pressurisation unit , 500L unvented hot water heater and control panel.
Installation of office Air condition system,ventilation heat recovery , heating and domestic services.